Commissioning and qualification software

Commissioning and qualification software for the whole V-model

From the I/O list and the first loop check to FAT, SAT and IQ/OQ/PQ, MGTrace keeps every commissioning and qualification protocol traced to the specification it verifies. One system, one V-model; one plant, one traceability matrix — with the loop checks generated from the I/O list into a protocol that is reviewed, executed and signed like everything else.

The first 5 users are free, with no time limit; every further user is €39 a month. Data hosted in the EU.

Why commissioning and qualification belong in one tool

Integrated commissioning and qualification — ASTM E2500, ISPE Baseline Guide 5 — rests on one idea: verification done well once, at the right level, is not repeated. A loop checked and documented at commissioning is evidence for the IQ; a function proven at FAT and confirmed at SAT is leveraged in the OQ. That only works if the commissioning records are as controlled and as traceable as the qualification ones. In practice they rarely are: the loop checks sit in a contractor's spreadsheet, the FAT in a supplier's PDF, and the qualification team starts again.

MGTrace treats the I/O list, the loop checks and the commissioning protocols as first-class controlled records: authored under version control, traced element by element to the design, executed with results that stay put, signed. The V-model of each system shows both legs — specifications down, commissioning and qualification up — and where each protocol sits on it is yours to decide.

What MGTrace covers

I/O list as a controlled document

Signal and engineering ranges kept apart (4–20 mA for 0–5 bar), the columns your project needs — rack, slot, channel — and each signal a traceable element linked to the design element that specifies it. Reviewed and approved like the DS.

Loop checks per signal type

Test procedures per class (AI, AO, DI, DO…) instantiated for every signal with its own range and unit — a 4–20 mA loop checked at 0, 50 and 100 % of span — generated from the I/O list into the loop-check protocol, executed and signed there; every test traced to its signal.

Pre-commissioning, FAT, SAT, functional testing

Protocols authored as test cards in a document, reviewed, approved, released for execution — the same workflow as the qualification protocols, with punch items raised where something is left open.

IQ, OQ, PQ

Qualification protocols with steps, expected results and acceptance criteria; results, evidence and signatures recorded on the released version; discrepancies with their own lifecycle.

The V-model per system

URS, FS, DS and the build on the left; loop checks, FAT, SAT, IQ, OQ, PQ on the right; the count of verification traces between each pair. Move any protocol to the rung your strategy puts it on.

Traceability matrix

Requirement → element → I/O → loop check → tests, read live per project or across the plant, gaps in amber, exported to CSV.

Punch list and discrepancies

Open items from commissioning tracked to closure with owner and date; failed qualification tests raised as discrepancies and resolved before approval.

Signatures and audit trail

21 CFR Part 11 electronic signatures with meaning and reason, hashed into a GMP audit trail; two-factor authentication; 15-minute inactivity log-off.

Worked example included

Load a complete vial-filler example — URS to PQ, six signals, loop checks, FAT, SAT, IQ/OQ/PQ — into a test site and see the whole chain before you write a line.

How it works

  1. 1

    Model the plant

    Site, areas, systems. The V-model, the documents and the protocols hang off the system.

  2. 2

    Specify

    URS, FS, DS with tagged elements traced level by level; the I/O list with each signal traced to its design element.

  3. 3

    Commission

    Generate the loop checks from the I/O list into their protocol; execute them; run pre-commissioning, FAT and SAT from their protocols; raise punch items.

  4. 4

    Qualify

    IQ against the design, OQ against the functions, PQ against the requirements — leveraging what commissioning already proved, and saying so in the trace.

  5. 5

    Report

    The traceability matrix and the executed protocols are the evidence; the validation summary report reads from them.

Compared with how C&Q is done today

No vendor names: what matters is the way of working. Most projects run commissioning in the contractor's spreadsheets and qualification in Word; the alternative usually offered is a qualification-only suite that leaves commissioning outside.

Spreadsheets & WordGeneric document / QMS suiteMGTrace
Loop checksOne spreadsheet per contractor; results typed in later.Outside the tool.Generated per signal from templates into a protocol, executed and signed, traced to the signal, part of the audit trail.
FAT / SATSupplier PDFs, filed; nothing traced.Attached as documents; tests not traced to elements.Protocols with test cards, each test traced to the functional element it verifies; SAT leverages FAT in the matrix.
Leverage into IQ/OQBy argument in the summary report.Manual cross-reference.Visible in the V-model and the matrix: a design element verified at pre-commissioning and at IQ shows both.
Punch listAnother spreadsheet.Sometimes.Punch items on the protocol they came from, with owner and target date, closed before approval.
Time to first protocolImmediate; every project from zero.Weeks to months of configuration.The same afternoon, from a template or the worked example.
CostFree, plus the hours.Enterprise licence, quoted.Free for the first 5 users; €39 per further user and month.

Commissioning records as controlled as qualification records

Version control

The I/O list and every protocol are documents: draft, review, approval, release, and amendments once approved — never edits in place.

Traceability

Design element → signal → loop check; functional element → FAT/SAT test → OQ test. Links are recorded, dated and attributable; the matrix recomputes from them.

Execution integrity

Results are recorded on the released version, with evidence, and signed per execution; a loop check is a test of its protocol, recorded there, not retyped from a sheet.

Annex 11 / Part 11

Electronic signatures with meaning and reason, a GMP audit trail, two-factor authentication, inactivity log-off, EU hosting and a validation package for the platform itself.

Read before you buy anything

Questions people ask

Can contractors use it in the field?
Yes. A protocol is executed from a phone or tablet in the browser, in the cabinet room or at the skid. Contractors are users of your organization with the role you give them, and every entry they make is attributed to them.
Does it support ASTM E2500 / integrated C&Q?
That is the model it is built around: commissioning and qualification protocols on the same V-model, each traced to the specification it verifies, so leverage is visible in the traceability matrix instead of argued in a report. Any protocol can be placed on the rung your strategy puts it on.
Where do the loop-check procedures come from?
From templates per signal type — analog input, analog output, digital input, digital output, and your own — with placeholders for the tag, the range, the unit and the injected signal at 0, 50 and 100 % of span. Generate for the signals you pick, from the I/O list or from inside the protocol; executed tests are never overwritten.
What about GAMP 5 categories and risk?
Systems carry their GAMP category and risk level; the risk assessment and the data-integrity assessment are documents of the system, next to the validation plan, and the depth of testing follows from them. The V-model does not force a fixed set of documents on you.
What does it cost?
The first 5 users are free with no time limit. Every further user is €39 a month, or ten months' price for a year — contractors included, for as long as they are on the project.
Can we try it with a realistic project?
Load the worked example: a vial filler with URS, FS, DS, an I/O list of six signals, loop checks, pre-commissioning, FAT, SAT, functional testing and IQ/OQ/PQ, all traced. It loads into a test site that is kept apart from your real work and can be deleted at any time.